Tax Increment District History

Tax Increment District History

** Denotes Economic Development District

TID # 1 - West Park Apartments
Resolution Creating District: March 7, 1983
Status / Date: Dissolved June 6, 1988
Not Adopted – No Project Plan

TID # 2 - City of Rapid City
Applicant: City of Rapid City/Main Street Program
Resolution Creating District: February 18, 1985
Status / Date: Paid and Dissolved February 5, 1990
pdf Project Plan (1.69 MB) Approved: August 17, 1987

TID # 3 – City of Rapid City
Resolution Creating District: May 6, 1985
Status / Date: Dissolved December 4, 1989
Not Adopted – No Project Plan

TID # 4 - Civic Center Block 18
Resolution Creating District: Not Created
Status / Date: District Never Created
Not Adopted – No Project Plan

TID # 5 - Barber Warehouse
Resolution Creating District: December 29, 1986
Status / Date: Dissolved December 21, 1987
Not Adopted – No Project Plan

TID # 6 - Rapid City Economic Development Foundation
Applicant: Creek Drive Road grant match
Resolution Creating District: December 29, 1986
Status / Date: Paid and Dissolved September 8, 1998
pdf Project Plan (998 KB) Approved: October 5, 1987
pdf 1st Revision to Project Plan (1.07 MB) Approved: March 7, 1988
pdf 2nd Revision to Project Plan (772 KB) Approved: September 5, 1989

TID # 7 - Walpole Heights Subdivision
Applicant: Ridco Jewelry
Resolution Creating District: July 6, 1987
Status / Date: Paid and Dissolved January 5, 2004
pdf Project Plan (1.65 MB) Approved: October 5, 1987

TID # 8 - Lewis & Kirkeby Office Site
Resolution Creating District: July 6, 1987
Status Date: Dissolved June 1, 1992
Not Adopted – No Project Plan

TID # 9 - Proposed Re-creation of TID #1
Resolution Creating District: Not Created
Status / Date: District Never Created
Not adopted – No Project Plan

TID # 10 - Civic Center Plaza Hotel and Block 18 area
Applicant: City of Rapid City - New York Street drainage, New York Street
    parking, Civic Center parking
Resolution Creating District: August 1, 1988
Status / Date: Paid and Dissolved July 7, 2003
pdf Project Plan (1.55 MB) Approved: April 19, 1993

TID # 11 - North of Rushmore Regional Industrial Park
Resolution Creating District: Not Created
Status / Date: District Never Created
Not Adopted – No Project Plan

TID # 12 - Milwaukee Road Freight House
Resolution Creating District: October 17, 1988
Status / Date: No Expenditures, Dissolved February 4, 1991
pdf Project Plan (1.45 MB) Approved: October 17, 1988

TID # 13 - Federal Express Package Handling Facility
Resolution Creating District: April 3, 1989
Status / Date: No Expenditures, Dissolved July 17, 1989
pdf Project Plan (1.22 MB) Approved: April 3, 1989

TID # 14 - Rapid City Economic Development Foundation
Resolution Creating District: Never Created
Status / Date: District Never Created
Not Adopted – No Project Plan

TID # 15 - Workrite Uniform Company
Applicant: Workrite
Resolution Creating District: July 3, 1989
Status / Date: Paid and Dissolved August 6, 2001
pdf Project Plan (1.25 MB) Approved: July 31, 1990

TID # 16 - Rapid City Economic Development Foundation
Applicant: DeBourgh Manufacturing
Resolution Creating District: September 5, 1989
Status / Date: No Expenditures, Dissolved December 4, 1989
pdf Project Plan (1.16 MB) Approved: September 18, 1989

TID # 17 - Federal Express Package Handling Facility
Applicant: Fisher Commercial Real Estate
Engineer: Davis-Atkins
Resolution Creating District: September 5, 1989
Status / Date: Paid and Dissolved March 19, 2007
pdf Project Plan (1.22 MB) Approved: September 18, 1989

TID # 18 - Horizon's Inc
Applicant: Horizons (aerial photography company)
Resolution Creating District: January 15, 1990
Status / Date: Paid and Dissolved February 7, 2005
pdf Project Plan (1.52 MB) Approved: July 2, 1990

TID # 19 - Speigel, Inc
Applicant: Peter Hegg, Frank Simpson
Resolution Creating District: August 6, 1990
Status / Date: Paid and Dissolved August 16, 2010
pdf Project Plan (1.09 MB) Approved: November 5, 1990

TID # 20 - Super Valu Stores, Inc
Resolution Creating District: May 6, 1991
Status / Date: Rescinded May 20, 1991
pdf Project Plan (1.47 MB) Approved: May 6, 1991

TID # 21 - Warren Windows, Inc
Applicant: Dan Warren, Paul Warren
Resolution Creating District: August 5, 1991
Status / Date: Paid and Dissolved July 10, 2000
pdf Project Plan (1.18 MB) Approved: August 5, 1991

TID # 22 - HiQual Manufacturing
Applicant: HiQual Manufacturing (cattle panels), A Akins
Resolution Creating District: August 17, 1992
Status / Date: Paid and Dissolved January 20, 2003
pdf Project Plan (1.44 MB) Approved: September 1, 1992

TID # 23 - New Town Plaza (Block Buster)
Applicant: B & T Investments, Tom Letner
Resolution Creating District: Not Created
Status / Date: Denied December 21, 1992
Not Adopted – No Project Plan

TID # 24 - Century Resources
Applicant: Cassandra Ward
Resolution Creating District: January 18, 1993
Status / Date: Paid and Dissolved August 2, 2004
pdf Project Plan (1.15 MB) Approved: January 18, 1993

TID # 25 - Park Drive
Applicant: City of Rapid City, Dr. Severson
Resolution Creating District: July 28, 1993
Status / Date: Paid and Dissolved August 20, 2001
pdf Project Plan (1.75 MB) Approved: July 28, 1993

TID # 26 - Timberline Corporation (Commerce Park LLC)
Applicant: Roy Ketel, Ken Ketel, Dick Murray, Dan Murray
Engineer: Bob Skull
Resolution Creating District: December 6, 1993
Status / Date: No Expenditures, Dissolved December 15, 2003
pdf Project Plan (1.44 MB) Approved: December 6, 1993
pdf 1st Revision to Project Plan (1.13 MB) Approved: September 8, 1998

TID # 27 - South US Highway 16 (South Dakota Gaming)
Applicant: SoDak Gaming, Clayton Trulson
Engineer: Alliance of Architects and Engineers
Resolution Creating District: June 6, 1994
Status / Date: Paid and Dissolved February 18, 2002
pdf Project Plan (1.55 MB) Approved: June 6, 1994

TID # 28 - Wall to Wall Sports
Applicant: Todd Tobin
Engineer: Lund Architects
Resolution Creating District: September 21, 1998
Status / Date: No Expenditures, Dissolved February 7, 2000
pdf Project Plan (1.16 MB) Approved: September 21, 1998
pdf 1st Revision to Project Plan (1.28 MB) Approved: August 2, 1999

TID # 29 - FiberSwitch Technologies
Applicant: Century Builders (Cassandra Ward)
Resolution Creating District: October 5, 1998
Status / Date: Dissolved w/unpaid expenditures December 3, 2018
pdf Project Plan (954 KB) Approved: October 5, 1998

TID # 30 - Gateway Gardens Assisted Living Facility
Applicant: Andy and Janice Anderson
Engineer: DesignWorks (Randy Fisher)
Resolution Creating District: Never Created
Status / Date: District Never Created
Not Adopted – No Project Plan

TID # 31 - Jolly Lane Drainage Improvements
Applicant: Doyle Estes
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: August 6, 2001
Status / Date: No Expenditures, Dissolved March 18, 2002
pdf Project Plan (4.97 MB) Approved: August 6, 2001

TID # 32 - Red Rocks
Applicant: Red Rock Development Co. (Kevin Buntrock, Joseph Graziano, Don Ward)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: November 5, 2001
Status / Date: Paid and Dissolved October 1, 2007
pdf Project Plan (1.72 MB) Approved: November 5, 2001
pdf 1st Revision to Project Plan (2.13 MB) Approved: August 7, 2006
pdf 2nd Revision to Project Plan (1.94 MB) Approved: April 16, 2007
pdf 3rd Revision to Project Plan (2.08 MB) Approved: September 4, 2007

TID # 33 - Fenske Media
Applicant: Rapid City Economic Development, Fenske
Resolution Creating District: December 17, 2001
Status / Date: Paid and Dissolved July 5, 2011
pdf Project Plan (1.10 MB) Approved: December 17, 2001

TID # 34 - Black Hills Harley Davidson
Applicant: Black Hills Harley Davidson, Buell Motorcycles
Engineer: Renner and Sperlich (Gary Renner, Doug Sperlich)
Resolution Creating District: December 17, 2001
Status / Date: Paid and Dissolved December 19, 2005
pdf Project Plan (1.89 MB) Approved: December 17, 2001

TID # 35 - Jolly Lane Drainage Improvements
Applicant: DTH LLC., Doyle Estes
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: March 18, 2002
Status / Date: Paid and Dissolved February 21, 2012
pdf Project Plan (1.96 MB) Approved: March 18, 2002
pdf 1st Revision to Project Plan (1.66 MB) Approved: August 16, 2010

TID # 36 - Disk Drive Extension
Applicant: Kevin Conway for Rodney and Norman McKie, Phase 5 Star I (Hendersons),
    DTH LLC (Doyle Estes) – Phase II
Engineer: FMG (Al Foster, Jerry Foster), Dream Design International (Hani Shafai)
Resolution Creating District: October 16, 2002
Status / Date: Paid and Dissolved November 15, 2010
pdf Project Plan (3.67 MB) Approved: October 16, 2002
pdf 1st Revision to Project Plan (1.10 MB) Approved: June 6, 2005
pdf 2nd Revision to Project Plan (1.23 MB) Approved: June 5, 2006
pdf 3rd Revision to Project Plan (1.14 MB) Approved: August 16, 2010

TID # 37 - Severson Drive
Applicant: City of Rapid City
Resolution Creating District: Not Created
Status / Date: Denied August 5, 2002
Not Adopted – No Project Plan

TID # 38 - Heartland Retail Center
Applicant: Heartland Retail Center, Doyle Estes
Engineer: Dream Design International (Hani Shafai), KTM Design Solutions (Kyle Treloar)
Resolution Creating District: February 17, 2003
Status / Date: Paid and Dissolved May 18, 2020
pdf Project Plan (1.52 MB) Approved: February 17, 2003
pdf 1st Revision to Project Plan (106 KB) Approved May 17, 2004
pdf 2nd Revision to Project Plan (1.51 MB) Approved February 6, 2017 

TID # 39 - East Rapid Plaza
Applicant: A/R Group, Charles Barker, Woodmont Co., Pat Tlustos
Engineer: Centerline (Larry Kostaneski)
Resolution Creating District: April 21, 2003
Status / Date: Inactive - reached 20 year timeline on 12/31/2023
pdf Project Plan (1.39 MB) Approved: April 21, 2003
pdf 1st Revision to Project Plan (1.49 MB) Approved: August 7, 2006
pdf 2nd Revision to Project Plan (1.61 MB) Approved: August 6, 2007

TID # 40 - South Creek Village
Applicant: Gandolf Group
Engineer: DLK Engineering
Resolution Creating District: May 19, 2003
Status / Date: Paid and Dissolved May 3, 2021
pdf Project Plan (1.61 MB) Approved: May 19, 2003

**TID # 41 - Fifth Street Extension south to Catron Blvd.
Applicant: Stoneridge LLC. (Sally Broucek, Neva Stumer, Rodney Stumer, Carryn Longhenry,
    Scheri Craig, Steven Craig, Scott Craig), Pat Hall, Hani Shafai, Lazy P6 (Orvil Davis),
    THF Realty
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: July 21, 2003
Status / Date: Paid and Dissolved February 3, 2014
pdf Project Plan (2.14 MB) Approved: July 21, 2003
pdf 1st Revision to Project Plan (1.91 MB) Approved: June 22, 2005
pdf 2nd Revision to Project Plan (3.87 MB) Approved: December 19, 2005
pdf 3rd Revision to Project Plan (3.34 MB) Approved: May 15, 2006
pdf 4th Revision to Project Plan (3.46 MB) Approved: July 21, 2008

TID # 42 - Elk Vale Water/Timmons Blvd
Applicant: Doyle Estes, DoJo LLC (Doyle Estes and Kathryn Johnson)
Engineer: Dream Design International (Hani Shafai), AE2S
Resolution Creating District: December 1, 2003
Status / Date: Paid and Dissolved July 1, 2019
pdf Project Plan (1.83 MB) Approved: December 1, 2003
pdf 1st Revision to Project Plan (3.85 MB) Approved: December 3, 2007
pdf 2nd Revision to Project Plan (3.60 MB) Approved: January 18, 2011

TID # 43 - Red Rocks Phase II Water Reservoir
Applicant: Red Rock Development Co. (Kevin Buntrock, Joseph Graziano, Don Ward),
    City of Rapid City
Engineer: FourFront
Resolution Creating District: October 6, 2003
Status / Date: Paid and Dissolved February 7, 2010
pdf Project Plan (1.42 MB) Approved: October 6, 2003

**TID # 44 - Mall Drive
Applicant: Mall Drive LLC (Dan Murray, Dick Murray), Kent Hagg, Brian Hagg,
    ByPass Development LLC (Mike Tennyson, Pat Tlustos), GLM Land Corp (Bill Gikling,
    Jim Meier), Kenneth Lipp
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: April 19, 2004
Status / Date: Paid and Dissolved December 15, 2014
pdf Project Plan (3.54 MB) Approved: April 19, 2004
pdf 1st Revision to Project Plan (1.81 MB) Approved: March 19, 2007

TID # 45 - Mallow Subdivision
Applicant: Joe Muth, Chad Myers
Resolution Creating District: Not Created
Status / Date: Denied July 19, 2004
Not Adopted – No Project Plan

TID # 46 - Red Rock Meadows
Applicant: Kevin Buntrock, Don Ward
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: September 20, 2004
Status / Date: Paid and Dissolved March 7, 2011
pdf Project Plan (1.28 MB) Approved: September 20, 2004
pdf 1st Revision to Project Plan (1.18 MB) Approved: April 16, 2007

**TID # 47 - Tower Road
Applicant: Skyline Pines East (Chris Stewart, Brian Bangs)
Engineer: Wyss Associates (Pat Wyss), FourFront
Resolution Creating District: October 4, 2004
Status / Date: Active
pdf Project Plan (1.64 MB) Approved: May 1, 2006
pdf 1st Revision to Project Plan (1.69 MB) Approved: December 3, 2007
pdf 2nd Revision to Project Plan (2.51 MB) Approved: November 2, 2009
pdf 3rd Revision to Project Plan (223 KB)  Approved: October 4, 2021

**TID # 48 - South Valley Drive Water
Applicant: BWWW Enterprise (Rebecca Wagner, Wesley Wood)
Engineer: Fisk Engineering (Warren Fisk)
Resolution Creating District: November 15, 2004
Status / Date: Paid and Dissolved December 20, 2010
pdf Project Plan (1.22 MB) Approved: November 15, 2004

**TID # 49 - East Anamosa Street
Applicant: NWE (Pat Tlustos), A/R Group (Charles Barker), Dwyer Royalties,
    Peter Hendricksen
Engineer: Centerline (Larry Kostaneski)
Resolution Creating District: January 17, 2005
Status / Date: Dissolved April 18, 2011
pdf Project Plan (5.04 MB) Approved: October 2, 2006

**TID # 50 - Federal Beef
Applicant: Founders Park LLC (Mike Tennyson, Pat Tlustos), Century Development
    (Cassandra Ward), Capital Development (Brian Gonzales), Toby Karn, Bob Brandt
Engineer: DesignWorks (Randy Fisher)
Resolution Creating District: December 20, 2004
Status / Date: Paid and Dissolved September 7, 2022
pdf Project Plan (2.13 MB) Approved: December 20, 2004
pdf 1st Revision to Project Plan (4.33 MB) Approved: November 7, 2005
pdf 2nd Revision to Project Plan (3.90 MB) Approved:  January 22, 2008
pdf 3rd Revision to Project Plan (2.56 MB) Approved: March 1, 2010

**TID # 51 - Kateland Subdivision
Applicant: Bill Freytag
Engineer: FMG (Al Foster, Jerry Foster)
Resolution Creating District: January 17, 2005
Status / Date: Paid and Dissolved January 17, 2012
pdf Project Plan (1.99 MB) Approved: February 7, 2005

**TID # 52 - East Saint Charles Street Improvements
Applicant: Jim Letner
Engineer: Sperlich (Kale McNaboe)
Resolution Creating District: May 2, 2005
Status / Date: Active
pdf Project Plan (2.50 MB) Approved: May 2, 2005

**TID # 53 - Stoney Creek Plaza
Applicant: Stoney Creek Plaza LLC (Jeffrey Bendt)
Engineer: Centerline (Larry Kostaneski)
Resolution Creating District: July 5, 2005
Status / Date: Paid and Dissolved February 2, 2015
pdf Project Plan (2.55 MB) Approved: July 5, 2005

**TID # 54 - Rainbow Ridge
Applicant: DTH LLC (Doyle Estes, Theodore Peiffer, Hani Shafai)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: October 3, 2005
Status / Date: Paid and Dissolved May 3, 2021
pdf Project Plan (2.57 MB) Approved: October 3, 2005
pdf 1st Revision to Project Plan (1.86 MB) Approved: April 7, 2008
pdf 2nd Revision to Project Plan (3.40 MB) Approved: June 5, 2017

**TID # 55 - Mall Ridge Lift Station
Applicant: Freeland Meadows (Boyce Kennedy, Brad Estes, Brett Estes, Sam Benne)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: October 17, 2005
Status / Date: Paid and Dissolved February 21, 2012
pdf Project Plan (2.86 MB) Approved: October 17, 2005
pdf 1st Revision (3.12 MB) to Project Plan Approved: May 15, 2006
pdf 1a Revision (3.03 MB) to Project Plan Approved: July 17, 2006
pdf 2nd Revision (4.10 MB) to Project Plan Approved: December 15, 2008

**TID # 56 - Rushmore Crossing
Applicant: Mid Atlantic, KDRK Properties (Kevin Buntrock, Rich Huffman, Hani Shafai,
    Don Ward)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: November 21, 2005
Status / Date: Active
pdf Project Plan (4.20 MB) Approved: February 6, 2006
pdf 1st Revision (3.90 MB) to Project Plan Approved: October 16, 2006
pdf 2nd Revision (5.45 MB) to Project Plan Approved: March 19, 2007
pdf 3rd Revision (3.79 MB) to Project Plan Approved: August 20, 2007

TID # 57 - Plum Creek
Applicant: Ray Elliott
Engineer: Centerline (Larry Kostaneski)
Resolution Creating District: December 19, 2005
Status / Date: No Expenditures, Dissolved February 20, 2006
Not Adopted – No Project Plan

TID # 58 - Black Hills Center
Applicant: Stoneridge LLC (Sally Broucek, Neva Stumer, Rodney Stumer, Carryn Longhenry,
    Scheri Craig, Steven Craig, Scott Craig)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: Not Created
Status / Date: Denied December 19, 2005
Not Adopted – No Project Plan

**TID # 59 - Farrar Business Park
Applicant: Tom Farrar and Chuck Farrar
Resolution Creating District: February 6, 2006
Status / Date: Dissolved March 21, 2011
pdf Project Plan (2.11 MB) Approved: February 6, 2006

TID # 60 - Nowlin Addition and Wood Addition
Applicant: City of Rapid City
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: Not Created
Status / Date: Denied April 17, 2006
Not Adopted – No Project Plan

**TID # 61 - The Villaggio at Golden Eagle
Applicant: Signature Development (Jennifer Langduth, Jeff Lage)
Engineer: Sperlich (Kale McNaboe)
Resolution Creating District: October 2, 2006
Status / Date: Paid and Dissolved May 5, 2013
pdf Project Plan (2.80 MB) Approved: October 2, 2006
pdf 1st Revision (2.66 MB) to Project Plan Approved:  September 17, 2007 
pdf 2nd Revision (2.69 MB) to Project Plan Approved: January 22, 2008
pdf 3rd Revision (2.50 MB) to Project Plan Approved: January 19, 2010

**TID # 62 - Downtown Revitalization
Applicant: Dream Design International (Hani Shafai)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: May 7, 2007
Status / Date: No Expenditures, Dissolved July 16, 2012
pdf Project Plan (2.72 MB) Approved: May 7, 2007

**TID # 63 - Copperfield Vistas
Applicant: Copperfield Vistas LLC (Bob Drew, Rich Evans)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: June 4, 2007
Status / Date: Paid and Dissolved July 20, 2015
pdf Project Plan (2.22 MB) Approved: June 4, 2007

**TID # 64 - Cabela's Economic Development
Applicant: Cabela’s Wholesale, Inc., Rapid City Economic Development
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: August 6, 2007
Status / Date: Active
pdf Project Plan (1.98 MB) Approved: August 6, 2007
pdf 1st Revision (2.94 MB)  Approved: February 9, 2017

**TID # 65 - Minnesota Street
Applicant: Plum Creek (Ray Elliot), SSST (Scott Zandstra, Steve Zandstra, Darcy Zandstra,
    Hani Shafai), Dennis Zandstra Real Estate Holdings (Scott Zandstra, Steve Zandstra,
    Darcy Torres)
Engineer: Centerline (Larry Kostaneski), Dream Design International (Hani Shafai)
Resolution Creating District: September 4, 2007
Status / Date: Active
pdf Project Plan (2.45 MB) Approved: September 4, 2007
pdf 1st Revision (629 KB) Approved: November 15, 2018
pdf 2nd Revision (182 KB)  Approved: October 5, 2021

**TID # 66 - Morningstar
Applicant: OS Development, Inc. (Dwight Sobczak, Phil Olsen)
Engineer: CETEC
Resolution Creating District: January 22, 2008
Status / Date: No Expenditures, Dissolved May 20, 2013
pdf Project Plan (2.83 MB) Approved: January 22, 2008

**TID # 67 - Brookfield
Applicant: Joe Muth
Engineer: Sperlich (Kale McNaboe)
Resolution Creating District: April 7, 2008
Status / Date: Paid and Dissolved September 16, 2019
pdf Project Plan (4.55 MB) Approved: April 21, 2008
pdf 1st Revision (4.40 MB) to Project Plan Approved:  June 3, 2019

**TID # 68 - Homestead
Applicant: Innovative Creations (Ron Shape)
Engineer: Sperlich (Kale McNaboe)
Resolution Creating District: April 21, 2008
Status / Date: Paid and Dissolved October 19, 2020
pdf Project Plan (3.65 MB) Approved: April 21, 2008
pdf 1st Revision (3.65 MB)  to Project Plan Approved: April 6, 2020

**TID # 69 - North Fire Station
Applicant: North Street Fire Station, LLC (Chuck Lien)
Engineer: Ferber Engineering (Dave Muck)
Resolution Creating District: July 21, 2008
Status / Date: Paid and Dissolved February 18, 2021
pdf Project Plan (1.83 MB) Approved: July 21, 2008
pdf 1st Revision (2.03 MB) to Project Plan Approved: June 15, 2009
pdf 2nd Revision (2.07 MB) to Project Plan Approved: March 18, 2013

**TID # 70 - S Hwy 16 Sanitary Sewer
Applicant: Hyland Park LLLP (Bob Drew, Rich Evans), Dream Design International
    (Hani Shafai), Hagg Development (Brian Hagg, Rex Hagg, Kent Hagg)
Engineer: Dream Design International (Hani Shafai), KTM Design Solutions (Kyle Treloar)
Resolution Creating District: September 15, 2008
Status / Date: Dissolved May 4, 2023
pdf Project Plan (1.82 MB) Approved: February 6, 2012
pdf 1st Revision (2.92 MB) to Project Plan Approved:  October 11, 2016

**TID # 71 - South Robbinsdale
Applicant: THF Realty (Michael Staenberg), THR RC Investors (Pat Hall, Hani Shafai,
    Sally Broucek, Scott Craig)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: March 21, 2011
Status / Date: Paid and Dissolved June 21, 2017
pdf Project Plan (2.42 MB) Approved: March 21, 2011

**TID # 72 - E. Saint Joseph Street Student Housing
Applicant: Technology Housing (Hani Shafai, Pat Hall)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: February 21, 2012
Status / Date: Active
pdf Project Plan (1.57 MB) Approved: February 21, 2012

**TID # 73 - Saint Joseph Street Parking
Applicant: President’s Plaza LLC (Hani Shafai, Pat Hall)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: May 21, 2012
Status / Date:  Dissolved July 3, 2017
pdf Project Plan (2.08 MB) Approved: May 21, 2012

**TID # 74 - East Minnesota Street
Applicant: Dennis Zandstra Real Estate Holdings (Scott Zandstra, Steve Zandstra,
    Darcy Torres)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: August 2, 2013
Status / Date: Dissolved September 7, 2022
pdf Project Plan (685 KB) Approved: July 1, 2013

**TID # 75 - E. St. Joseph Street Housing 2
Applicant: Technology Housing 2 (Hani Shafai, Pat Hall)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: December 1, 2014
Status / Date: Dissolved May 16, 2023
pdf Project Plan (2.48 MB) Approved: December 1, 2014

**TID # 76 – Buffalo Crossing
Applicant: KS West and SK East (Ryan Kaski dba Kaski Homes and Hani Shafai
    dba Dream Design International)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District: March 21, 2016
Status / Date: Active
pdf Project Plan (3.19 MB) Approved: March 21, 2016

**TID # 77 – Rushmore Gateway Corridor
Applicant: Black Hills Corporation
Engineer: Ferber Engineering (Dave Muck)
Resolution Creating District: April 4, 2016
Status / Date: Active
pdf Project Plan (1.28 MB) Approved: April 4, 2016

**TID # 78 - Unnamed Tributary
Applicant: Yasmeen Dream LLC (Hani Shafai)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District:  October 3, 2016
Status / Date:  Dissolved August 4, 2022
pdf Project Plan (1.34 MB) Approved:  October 3, 2016
pdf 1st Revision (4.57 MB) to Project Plan Approved:  November 5, 2019

**TID # 79 - The Village on Monroe
Applicant: NeighborWorks (Joy McCracken)
Engineer: Britton Engineering
Resolution Creating District: June 5, 2017
Status / Date:  Dissolved, No Expenditure; 8/18/2020
pdf Project Plan (3.38 MB) Approved: June 12, 2017

**TID # 80 - Promise Road
Applicant: North Atlantic Developers LLC (Hani Shafai, Rich Huffman)
Engineer: Dream Design International (Hani Shafai)
Resolution Creating District:  December 4, 2017
Status / Date:  Active
pdf Project Plan (4.92 MB) Approved:  December 4, 2017

 **TID # 81 - Park Hill
Applicant: Park Hill Development, Inc. (Tony Marshall, Tim Duda, Mark Bradsky)
Engineer: Sperlich (Kale McNaboe)
Resolution Creating District:  April 16, 2019
Status / Date:  Active
pdf Project Plan (2.06 MB) Approved:  April 16, 2019

**TID # 82 - Orchard Meadows Lift Station
Applicant: Yasmeen Dream LLC ( Hani Shafai)
Engineer: Dream Design International Inc (Hani Shafai)
Resolution Creating District:   June 3, 2020
Status/Date:   Active
pdf Project Plan (5.24 MB)  Approved:  October 19, 2020

**TID # 83 - Homestead Street Extension
Applicant: City of Rapid City, Homestead Street Project LLC
Engineer: KTM Design Solutions
Resolution Creating District:  October 5, 2020
Status/Date:  Active
pdf Project Plan (65 KB)  Approved:  October 19, 2020

**TID # 84 - East Anamosa Extension
Applicant: Yasmeen Dream LLC (Hani Shafai)
Engineer: Dream Design International LLC (Hani Shafai)
Resolution Creating District:  January 4, 2021
Status/Date:  Active
pdf Project Plan (5.95 MB) Approved:  January 19, 2020
pdf 1st Revision (1.22 MB)  to Project Plan Approved: Nov 6, 2023

**TID # 85 - Block 5 Project
Applicant: Block 5, LLC
Engineer: C.R.Lloyd Associates, Inc.
Resolution Creating District:  April 6, 2022
Status/Date:  Active
pdf Project Plan (9.90 MB)  Approved:  April 6, 2022

**TID # 86 - Black Hills Industrial Center
Applicant: Black Hills Industrial Center, LLC
Engineer: Dream Design International, Inc.
Resolution Creating District:  May 17, 2022
Status/Date:  Active
pdf Project Plan (7.35 MB)  Approved:  May 17, 2022

TID # 87 - Youth Soccer Infrastructure
Applicant: Youth Soccer Infrastructure, LLC
Engineer: Indigo Design, Inc.
Resolution Creating District:  December 27, 2022
Status/Date:  Active
pdf Project Plan (5.93 MB) Approved:  November 21, 2022

TID # 88 - Country Road Exension West
Applicant: Eastern Slope Land Corporation
Engineer: Vanocker Development
Resolution Creating District:  May 22, 2023
Status/Date:  Active
pdf Project Plan (336 KB)  Approved:  May 22, 2023

TID # 89 - Highpointe North Subdivision Lift Station
Applicant: Watershed Development II LLC
Engineer: Site Works Specialists, Inc.
Resolution Creating District: May 22, 2023
Status/Date:  Active
pdf Project Plan (587 KB) Approved:  May 22, 2023

TID # 90 - Sagebrush Flats Affordable Housing
Applicant: Blueline Devevlopment, LLC
Engineer: Indigo Design, LLC
Resolution Creating District:  June 6, 2023
Status/Date:  Active
pdf Project Plan (456 KB) Approved:  June 6, 2023